*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Wastewater Treatment Facility Digester 1 Cleaning

Description of Work. The Project to be performed consists of furnishing all labor, materials, tools, equipment, and transportation required to complete the Project, with a scope of work to generally include, but is not limited to, the following: full-service removal and disposal of all liquids and solids from Digester #1 and wash down of the interior (the “Work”). full-service removal and disposal of grit from the south grit tank at the Preparation Grit Removal Structure and a wash down of the interior (the “Work”)

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 03/05/2024 – 2:00 PM
Pre-Bid Mtg: Yes – Mandatory
Pre-Bid Mtg Date: 02/08/2024 – 11:00 AM
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:c401607

Ralph Giglio
Ralph.Giglio@denaliwater.com

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 03/05/2024 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.