HVAC REPLACEMENTS BOSTONIA GLOBAL HIGH SCHOOL, EMPOWER ACADEMY AND RIOS ELEMENTARY SCHOOL
SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated the Contract and shall provide all labor,
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Kimmy Truong
Kimmy.Truong@vta.org
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated the Contract and shall provide all labor,
PROJECT DESCRIPTION Built in 1970, 440 N. Camden Drive building is a 154,000 SF, 6-story municipal parking structure with ground
PROJECT DESCRIPTION The work to be done consists of furnishing all materials, equipment, tools, supervision, labor and incidetails required to
General work description: Cold plane asphalt concrete pavement and overlay with RHMA-G
Scope of Services The proposed Work shall be performed in accordance with the plans, specifications and other contract documents and
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.