Mark Thomas Drive and Sloat Avenue Separated Bike/pedestrian Path Study, Preliminary Design, and Environmental Document
SCOPE OF WORK SCOPE OF WORK FOR MARK THOMAS DRIVE AND SLOAT AVENUE SEPARATED BIKE/PEDESTRIAN PATH STUDY, PRELIMINARY DESIGN, AND
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
SM Saklaen
ssaklaen@cityofpleasantonca.gov
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
SCOPE OF WORK SCOPE OF WORK FOR MARK THOMAS DRIVE AND SLOAT AVENUE SEPARATED BIKE/PEDESTRIAN PATH STUDY, PRELIMINARY DESIGN, AND
DESCRIPTION The Sheriff’s Office’s Custody Services Division has 22 full time Correctional Officers, 1 sworn Sergeant, 1 sworn Lieutenant, and
Scope of Services The Curb, Gutter, & Sidewalk Division is wanting to add a concrete contractor to assist with the
General work description: Culvert lining
SCOPE OF WORK A general outline of the scope of work is provided below. It is the District’s expectation that
Project Description: Bids are requested by Owner, for a general construction contract, or work described in general, as set forth
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.