*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Valley Avenue and Northway Road Intersection Improvements

SCOPE OF WORK. This work will consist of removing existing southeast and southwest concrete channelizing medians, removing an existing flashing crosswalk, construction of concrete curb extensions (bulb-outs) at the southeast and southwest curbs, installing minor landscaping and irrigation, constructing Americans with Disabilities Act (ADA) curb ramps, and installing a traffic signal. Electrical work would compose of: protection of existing utilities and appurtenances; the installation of foundations, pole standards, mast arms, signal display equipment, luminaires, lamps, underground conduits, pull boxes, cables and conductors; the bonding and grounding of circuitry

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 02/21/2024 – 2:00 PM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Est. Min: $1053333
Engineer’s Est. Max: $1053333

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:23532

(925) 931-5667
cnovenario@cityofpleasantonca.gov

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 02/21/2024 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.