Water Treatment Solids Services
SCOPE OF WORK The annual solids production at the Randall-Bold Water Treatment Plant and the Bollman Water Treatment Plant is
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Maribeth Tan (562) 908-4288
btan@lacsd.org
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
SCOPE OF WORK The annual solids production at the Randall-Bold Water Treatment Plant and the Bollman Water Treatment Plant is
SCOPE OF WORK. The CONTRACTOR shall perform within the time stipulated the contract as herein defined, and shall provide all
General Engineering, Earthwork, Landscaping, Electrical, Concrete, Paving, Plumbing and General Building. In order to be eligible all contractors must provide
Scope of Services The work generally consists of Type II Emulsion-Aggregate Slurry application, Asphalt-Rubber Aggregate Membrane (ARAM) Cape Seal application,
Project Description The District proposes to construct five new potable water storage tanks with usable 120,000- gallon water storage to
THIS PROJECT INCLUDES Hoover High School Main Office Flooring Improvements
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.