*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
Traffic Signal Modifications at the intersections of Baseline Road and Grand Avenue
- Post ID: 226573
- Posted: 03/25/2024
- Updated: 04/16/2024
Project Information
*BidAmerica Membership is required to view all information.*
Agency Information
*BidAmerica Membership is required to view the agency contact information.*
Abel Paguio
apaguio@cityofglendora.org
Documents Available
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
Other Projects
2024 Annual Street Repair and Resurfacing
Description. The Project involves grinding the existing pavement, performing digout repairs, installing hot mix asphalt leveling course and overlay, microsurfacing,
Community Skate Park Replacement, CIP ET0027
THIS PROJECT INCLUDES COMMUNITY SKATE PARK REPLACEMENT, CIP ET0027
Traffic Signal Modification at Warner Avenue and Wright Street (CDBG)
Scope of Services Scope of work includes installation of traffic signal poles, conduit, wiring, fiber optic cable, video detection system,
Roads Program Capital Improvement Project Plan Package 1
Scope of Work.
Services. Contractor shall perform the Services described in Exhibit A, subject to all
terms and conditions in
Sierra View Elementary School Exterior Paint and Dryrot Repairs
SCOPE OF WORK: The Contractor shall furnish all labor, materials, equipment, tools, and utility and transportation services, and perform and
Questions / Comments
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.