Construction on State Highway in Lassen County Near Madeline From 0.8 Mile North to 3.8 Miles North of Ash Valley Road
General work description: Place hot mix asphalt (Type A) and replace asphalt concrete surfacing.
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Ron Benedetti 661-722-6552
ronald.benedetti@avc.edu
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
General work description: Place hot mix asphalt (Type A) and replace asphalt concrete surfacing.
SCOPE OF SERVICES The specific scope of work and fee schedule for each work product will be individually agreed upon.
PROJECT DESCRIPTION: This project is located at the Zuckerberg San Francisco General Hospital & Trauma Center (ZSFG), Building 5, at
DESCRIPTION OF WORK: Project Background Information and Purpose The purpose of this RFP is to seek proposals from qualified firms
Scope of Work (but not limited to): The project includes Access Control, Video Surveillance & Intrusion Detection systems. For Access
Scope of Services The Project consists of concrete and site work
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.