2023-24 Street Maintenance Project and W. Metz Rd. Alley Pavement
DESCRIPTION:The project is located North of Teak, South of 4th Street, East of A Street, West of Redlands Ave with
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Mr. Henry Castro
hcastro@aesd.org
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
DESCRIPTION:The project is located North of Teak, South of 4th Street, East of A Street, West of Redlands Ave with
SCOPE OF WORK Design-build entity shall provide services and work in accordance with CalSHAPE Ventilation Guidelines and shall include, without
SCOPE OF WORK This specification is meant to be performance based but does provide general guidelines for the Contractor. The
Project Description: The Vista Canyon Bridge and Road Improvements project will construct a new bridge over the Santa Clara River,
Scope of Services The park renovation includes the construction of new irrigation system, landscape, drainage, concrete pathways/flatwork, fencing, lighting, security
THIS PROJECT INCLUDES FY 2023/24 PAVEMENT REHABILITATION PROJECT: In general, the work includes the pavement maintenance of existing improvements and
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.