*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Vista Canyon Bridge and Road Improvements Project

Project Description: The Vista Canyon Bridge and Road Improvements project will construct a new bridge over the Santa Clara River, spanning approximately 780-feet and consist of one lane in each direction with a striped median, safety lighting, concrete barriers, metal railing, raised landscape planter, sidewalk with a Class 1 bike lane, and a new bike trail under the bridge. The project will also provide roadway improvements such as curb, gutter, pavement, base, striping, traffic signal installation, street lights, landscape, storm drain and utility work to the north of the bridge at the intersection of Soledad Canyon Road and the future Vista Canyon Boulevard (currently Lost Canyon Road) and to the south of the bridge at the Vista Ranch Community connection.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 06/04/2024 – 2:00 PM
Pre-Bid Mtg: Yes – Non-Mandatory
Pre-Bid Mtg Date: 05/15/2024 – 9:00 AM
Engineer’s Est. Min: $25000000
Engineer’s Est. Max: $26000000

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:CIP-23-24-S3037

Jaclyn Abston (661) 255-4936
jabston@santa-clarita.com

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 06/04/2024 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.