*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

South Escondido Access Improvements Project

Project Description The South Escondido Access Improvements Project (Project) has the following goals: Prohibit uncontrolled left turns across Centre City Parkway (CCP), particularly at S. Escondido Boulevard. Provide signalized access at CCP and Brotherton as well as at their frontage streets (S. CCP and S. Escondido Boulevard), including improved pedestrian access. Calm traffic and improve aesthetic appeal along CCP between the intersections of S. Escondido Boulevard and CCP (on the north end) and CCP and Cranston Drive (on the south end). It is important to note that the majority of Cranston Drive runs parallel to CCP, however south of the intersection of CCP and W. Citracado Parkway, Cranston Drive intersections CCP. Address parking needs along the frontage streets of S. CCP and S. Escondido Boulevard.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 09/11/2023 – 5:00 PM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Est: We requested the engineer’s estimate from the agency on 08/15/2023. Follow this project to receive further updates.
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #: n/a

Nicholas Josten
njosten@escondido.org

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 09/11/2023 – 5:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.