Soquel Canyon Parkway Pavement Rehabilitation – Phase 2
DESCRIPTION OF THE WORK: The Work comprises, but is not limited to: mobilization; traffic control; 1.5-inch full-width grind and 1.5-inch
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Chad Blais 951-270-5678
cblais@ci.norco.ca.us
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
DESCRIPTION OF THE WORK: The Work comprises, but is not limited to: mobilization; traffic control; 1.5-inch full-width grind and 1.5-inch
Scope of Services THE OBJECTIVE OF THE CHANDLER BIKEWAY EXTENSION PROJECT IS TO EXTEND THE EXISTING CHANDLER BIKEWAY FROM ITS
DESCRIPTION:The project is located North of Teak, South of 4th Street, East of A Street, West of Redlands Ave with
Scope of Services Citywide Speed Surveys. Traffic engineering design plans include traffic signals, street lighting, signal communications, signing/striping, and traffic
SCOPE OF SERVICES: VTA’s Blue Line light rail service currently operates between Santa Teresa station in South San Jose and
Scope of Services The proposed Work shall be performed in accordance with the plans, specifications and other contract documents and
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.