Sea Level Rise, Tsunami Hazards, and Erosion Resilience Strategy for Noyo Harbor
Scope of Work The goal of Task 1 is to inventory existing infrastructure, habitat, and other values potentially at risk
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
John Eriksen
purchasing@cccd.edu
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
Scope of Work The goal of Task 1 is to inventory existing infrastructure, habitat, and other values potentially at risk
General work description: Cold plane asphalt concrete pavement and overlay with RHMA-G
Scope of Work. The Work generally consists of furnishing all labor, materials, tools, equipment, and incidentals necessary to rehabilitate the
GENERAL WORK DESCRIPTION: The work includes but is not necessarily limited to the following: Protecting in place existing improvements and
General work description: Culvert lining
– SCOPE OF WORK: The Contractor shall furnish all labor, materials, equipment, tools, and utility and transportation services, and perform
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.