*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Sea Level Rise, Tsunami Hazards, and Erosion Resilience Strategy for Noyo Harbor

Scope of Work The goal of Task 1 is to inventory existing infrastructure, habitat, and other values potentially at risk in order to establish the “baseline condition” of Noyo Harbor in its current state. The consultant will prepare a baseline conditions analysis, where the consultant will review, summarize, and synthesize existing resources to develop an understanding of the existing conditions within Noyo Harbor. Resources shall include, but not be limited to, the Mendocino Multi-Jurisdictional Hazard Mitigation Plan and Geographic Information Systems (GIS) mapping data for the project area, including topography, existing infrastructure, key wildlife and habitat areas, tribal cultural resources, and historical information, including photographs, of the Noyo Harbor over time.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 05/24/2024 – 3:00 PM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #: n/a

Diana Sanchez
dsanchez@fortbragg.com

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 05/24/2024 – 3:00 PM

Other Projects

WHB #2 Tube RFT Testing

The Central Contra Costa Sanitary District is requesting quotations from registered, licensed, qualified, experienced and reputable RFT on WHB #2

Read More »

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.