*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Palo Alto Horizontal Levee Pilot Project

Scope of Work The scope of work includes, but is not limited to: Mobilization, including site access, the establishment of staging areas and temporary construction facilities and controls Development and implementation of a Traffic Control Plan Supplemental erosion control measures and SWPPP compliance Environmental protection, including compliance with all permit conditions including removal of surface vegetation and installation of wildlife exclusion fencing Demolition and removal of all items slated for removal as noted on the Drawings and listed in these Technical Specifications installations of a new Renzel Marsh pump and associated piping valves, flow meters, other appurtenances, mechanical equipment, and associated electrical work. Installation of new horizontal levee supply effluent pipeline and associated valves, flow meters, and other appurtenances

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 04/24/2024 – 2:00 PM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:SFEP-IFB-26825

Noah Cohen
ncohen@bayareametro.com

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 04/24/2024 – 2:00 PM

Other Projects

Traffic Engineering Services

Scope of Services Citywide Speed Surveys. Traffic engineering design plans include traffic signals, street lighting, signal communications, signing/striping, and traffic

Read More »

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.