*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Neary St Sewer Rehabilitation

SCOPE OF WORK The work to be done consists, in general, of removing the existing 6” vitrified clay pipe and replacing it with new 8” pipe along Neary St and Blackburn St. The work also includes replacing sanitary sewer manholes and spot repairing 18” storm drain along with other related construction activities. The Contractor shall submit a construction schedule for the work. The City shall have review authority over said schedule. The contractor shall provide all labor, materials, tools, equipment, and services required for the complete and proper execution of all the work as shown on the drawings and/or outlined in these specifications. Work shall include items not specifically mentioned herein or noted on plans but necessary to make a complete working installation of all systems shown or described herein.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 03/21/2024 – 2:00 PM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:c401511

Cina Seyedkazemi (831) 420-5177
cseyedkazemi@santacruzca.gov

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 03/21/2024 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.