Upper Atherton Creek Stabilization and Flood Mitigation Project
SCOPE OF SERVICES In 2014, an update to the 2001 Drainage Study was requested. Recent residential development may have impacted
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Alison Fretwell 760-752-7130
afretwell@vwd.org
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
SCOPE OF SERVICES In 2014, an update to the 2001 Drainage Study was requested. Recent residential development may have impacted
SCOPE OF SERVICES The City of Sonoma is requesting proposals from qualified contractors to provide on-call tree trimming and Certified
SCOPE OF WORK SCOPE OF WORK FOR MARK THOMAS DRIVE AND SLOAT AVENUE SEPARATED BIKE/PEDESTRIAN PATH STUDY, PRELIMINARY DESIGN, AND
SCOPE OF WORK: The Contractor shall furnish all labor, materials, equipment, tools, and utility and transportation services, and perform and
SCOPE OF WORK The work to be performed consists, in general, of grading existing shoulder, furnishing temporary pavement, full-depth reclamation
DESCRIPTION: The work in general consists of improvements to the Linda-Beach Pickleball
Courts, including repair of surface defects in all
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.