*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Marina Pumping Plant No. 1 Site Improvements

Scope of Work The methane soil gas testing project was performed at 6120 East Pacific Coast Highway in the City of Long Beach, California. Methane testing was performed at two locations at a depth of six (6) feet bgs using standard soil gas testing procedures to identify any pockets of methane. The soil gas probes were sampled after a minimum of 2 to 48 hours after installation, allowing enough time for subsurface equilibrium. Provided below is a general scope of work EST completed for the methane testing at the Site. Preparation of a site-specific health and safety plan for methane testing activities. Gas pressure was measured prior to methane testing using Magnehelic™ pressure gauges capable of measuring pressure to 0.01 inches of water column (IWC).

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 05/07/2024 – 2:00 PM
Pre-Bid Mtg: Yes – Mandatory
Pre-Bid Mtg Date: 04/09/2024 – 10:00 AM
Engineer’s Est: We requested the engineer’s estimate from the agency on 03/29/2024. Follow this project to receive further updates.
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #: n/a

(952) 233-1632
info@questcdn.com

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 05/07/2024 – 2:00 PM

Other Projects

Surveying Services

Project Description: The City is interested in securing firms for the specific purpose of obtaining on-call surveying services. This RFQ

Read More »

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.