Toland Road Landfill Phase 4c Liner Expansion
SCOPE OF WORK:The scope of work for this study is presented in OGI’s proposal dated February 14, 2022, which was
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
kroberts@cityofpleasantonca.gov
tmucha@cityofpleasantonca.gov
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
SCOPE OF WORK:The scope of work for this study is presented in OGI’s proposal dated February 14, 2022, which was
Scope of Services Contractor shall furnish labor, materials, equipment, services, and specialized skills to perform work involved in the Project.
General work description: Methacrylate, polyester overlay, and slope repair.
Scope of Services The work to be completed involves demolition, slurry seal, crack seal, surface and full-depth repairs, removal and
SCOPE OF WORK: The Contractor shall furnish all labor, materials, equipment, tools, and utility and transportation services, and perform and
Project Description: Bids are requested by Owner, for a roofing contract, or work described in general, as set forth in
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.