Improve Peralta Oaks North Project
Scope of Work The scope of the survey was as follows: Inspect the subject building for the presence of suspect
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Steffen Meyer 805-875-8240
s_meyer@ci.lompoc.ca.us
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
Scope of Work The scope of the survey was as follows: Inspect the subject building for the presence of suspect
Scope of Services The proposed Work shall be performed in accordance with the plans, specifications and other contract documents and
General work description: Methacrylate, polyester overlay, and slope repair.
SCOPE OF WORK: Statement of Work (SOW) for Board Room Visual System Equipment Installation Project 2024. The District plans to
General work description: Cold plane asphalt concrete pavement and overlay with RHMA-G
The Project consists of: 3. To bid on this Project, the Bidder is required to possess one or more of
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.