Fy 2024-25 Annual Major Streets Rehabilitation Program: Fitzgerald Road (First Street to Erringer Road and Sycamore Drive to Appleton Road), CP60000018
SCOPE OF WORK: The Major Street Rehabilitation Program will consist of: 1) construction surveying; 2) 377,000 S.F. of 2 ½”