2023 Pavement Rehabilitation Project
SCOPE OF WORK Scope of Work to be performed consists of Contractor furnishing all materials, equipment, tools, labor, and incidentals
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
qbsupport@colbitech.com
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
SCOPE OF WORK Scope of Work to be performed consists of Contractor furnishing all materials, equipment, tools, labor, and incidentals
SCOPE OF WORK Design-build entity shall provide services and work in accordance with CalSHAPE Ventilation Guidelines and shall include, without
SCOPE OF WORK The Contractor shall adhere to all safety precautions at all times. Advanced notice is required, prior to
Scope of Services The work to be performed consists, in general, of a 6-mile-long multiuse path from the Kern River
SCOPE OF WORK SCOPE OF WORK FOR MARK THOMAS DRIVE AND SLOAT AVENUE SEPARATED BIKE/PEDESTRIAN PATH STUDY, PRELIMINARY DESIGN, AND
General work description: Culvert lining
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.