SUNDANCE PARK BOUNDARY WALL RESTORATION
The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans,
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Ludwig Lapus
construction@ocsan.gov
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans,
The work to be done consists, in general, consist of installation of concrete sidewalks, driveway approaches, concrete ramps, alley approaches,
The scope of work is to provide the necessary site review, research of existing utilities, right of way/easements, land ownerships,
This project includes Concrete Facilities Removal and Replacement – Citywide Phase 10
SCOPE OF WORK The District will have the need to procure profes s ional s ervices from a licens ed
The City of Corona is seeking a qualified consultant to provide Professional Services for the 2023/24 Sidewalks and Curb Ramps
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.