2024 Summer Roof Restoration Project
THIS PROJECT INCLUDES 2024 SUMMER ROOF RESTORATION PROJECT
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Sylvia Hinojosa 951-943-6369
sylvia.hinojosa@puhsd.org
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
THIS PROJECT INCLUDES 2024 SUMMER ROOF RESTORATION PROJECT
PROJECT DESCRIPTION The existing Tanner Water Treatment Plant (WTP) does not have sufficient backwash capacity (storage, recycling, pumping and sludge
SCOPE OF WORK 2.1 Summary and Scope of Services Novato’s Department of Public Works (the “CITY”) seeks proposal to: “Center
SCOPE OF WORK Request for Proposals (RFP) 4-2171 – State Route 73 (Bison Avenue to Interstate 405) Multimodal Corridor Feasibility
SCOPE OF WORK This Specification and the accompanying drawings govern the work involved in furnishing, installing, testing and placing into
General work description: Cold plane asphalt concrete pavement and overlay with RHMA-G
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.