*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Design of Bandicoot Basin

SCOPE OF WORK : The proposed Bandicoot Basin Project (Project) follows the Hesperia Master Plan of Drainage (MPD) dated May 1996 prepared for the District by Williamson & Schmid and Huitt-Zollars. The MPD calls for a regional facility detention basin immediately upstream of the California Aqueduct (Sta. 1890+00, Mile Post 397.3) which intercepts and attenuates MPD tributaries H-01/H-07/H-06.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 01/29/2024 – 3:00 PM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:PWG124-FLOOD-5187

Ibram Gayed (909) 387-8213
Ibram.Gayed@dpw.sbcounty.gov

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 01/29/2024 – 3:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.