*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Debris Removal at Surfer’s Point and Ventura Pier Beaches

SCOPE OF THE WORK This section of the beach extends from the Ventura Pier upcoast approximately 750 feet to California Street. Contractor should remove as much of the invasive arundo debris as possible, using hand rakes as necessary to remove smaller pieces. Contractor shall remove wood debris larger than 4 inches in diameter. Contractor shall attempt to leave in place pieces of natural driftwood between one 1 and 4 inches when feasible. Contractor shall use chainsaws as necessary to cut up tree trunks and other large pieces of wood. Contractor shall use an excavator(s), track loader(s) (for the beach), rubber tire loader(s) for the parking lot and street. Contractor shall use crew for hand work, traffic and pedestrian control. Beach Section 1 will be accessed at the State Parks parking lot downcoast of the Pier.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 04/25/2024 – 4:00 PM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Est: We requested the engineer’s estimate from the agency on 04/22/2024. Follow this project to receive further updates.
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #: n/a

Nicole Supan
nsupan@cityofventura.ca.gov

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 04/25/2024 – 4:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.