*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Construction Management Services for the Boronda Road Congestion Relief Project – Phase 1 (CIP 9510)

Scope of Services The City of Salinas’ Public Works Department is seeking to retain a Construction Management firm to oversee the Boronda Road Congestion Relief Phase 1 Project. The Project includes widening and intersection improvements of approximately 0.7 miles of East Boronda Road between Dartmouth Way and 1,700 feet east of McKinnon Street intersection, including a new multi-lane roundabout at the McKinnon Street and Boronda Road intersection. Work also includes but is not limited to: construction of storm water treatment facilities and bioretention facilities in the roadway medians, islands, and adjacent to sidewalks, construction of shared-use paths, construction of bike lanes, bus pullouts, street lighting, sidewalks, ADA pedestrian access ramps, installation of storm drain lines, sanitary sewer mainline extension, pavement delineation, roadway signs, landscaping, and all other related improvements and requirements.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 05/14/2024 – 2:00 PM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #: n/a

Josie Lantaca 831-758-7185
diosefe@ci.salinas.ca.us

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 05/14/2024 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.