*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Chino/montclair ADA Ramps

SCOPE OF WORK The work, in general, consists of sawcut and remove existing asphalt concrete; sawcut and remove existing minor concrete; milling; overlay; grading and placing asphalt concrete surfacing; construct curb and gutter; construct spadrell and/or cross gutter; construct ADA ramp; place detecable warning surface; construct concrete sidewalk; construct retaining curb; construct grouted rock; reset roadside sign; adjust to grade existing water valve; paint traffic stripe and pavement markings; construct hydrant pad; paint red curb and doing other work appurtenant thereto.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 01/25/2024 – 10:00 AM
Pre-Bid Mtg: Yes – Non-Mandatory
Pre-Bid Mtg Date: 01/10/2024 – 10:00 AM
Engineer’s Est: We requested the engineer’s estimate from the agency on 01/09/2024. Follow this project to receive further updates.
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #: n/a

Jim Bollier (909) 469-6333
jim.bollier@ftr.com

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 01/25/2024 – 10:00 AM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.