Nevada Street Bridge Rehabilitation Project
Scope of Work The following is an outline of tasks required to do this work. The tasks should include, but
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
(909) 291-2938
snix@uplandca.gov
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
Scope of Work The following is an outline of tasks required to do this work. The tasks should include, but
Scope of Services The Curb, Gutter, & Sidewalk Division is wanting to add a concrete contractor to assist with the
Scope of Work. The cost estimate shall be broken down by task, man-hours per task, different personnel classifications per man-hour
PROJECT DESCRIPTION The existing Tanner Water Treatment Plant (WTP) does not have sufficient backwash capacity (storage, recycling, pumping and sludge
DESCRIPTION : Work may include, but is not limited to the following: Perform Consultations with City staff and other appropriate
General work description: Cold plane the roadway and overlay with RHMA-G, seal random cracks.
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.