*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Alisal Road Reconstruction Project Hartnell Road to Sconberg Parkway

THIS PROJECT INCLUDES The work consists of performing full-depth recycling (full depth reclamation) of the existing asphalt pavement and placing hot mix asphalt concrete overlay, including but not limited to drainage work, micro milling, pavement delineation, adjustment of frame and cover to grade, clearing and grubbing, and traffic control.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 04/22/2024 – 1:00 PM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Est. Min: $3936000
Engineer’s Est. Max: $3936000

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:1577

Ivo Basor (831) 796-6427
basori@co.monterey.ca.us

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 04/22/2024 – 1:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.