*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Alder Avenue Water Main Replacement

Scope of Services Construction of approximately 1,000 linear feet of 8-inch water main, fire hydrants, air release valve, tapping of existing 8-inch water main along Alder Avenue, and asphalt pavement restoration, all within the residential area of Incline Village, NV. Work also includes the abandonment of existing 8-inch steel water main.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 03/14/2024 – 2:00 PM
Pre-Bid Mtg: Yes – Non-Mandatory
Pre-Bid Mtg Date: 02/22/2024 – 2:00 PM
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:2299WS1802

Ronnie Rector 775-832-1267
rlr@ivgid.org

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 03/14/2024 – 2:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.