*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

2023 Bridge Repairs Project

SCOPE OF WORK: Mobilization Construction Staging Area Setup and Debris Disposal Implementation on Erosion and Sediment Control Best Management Practices (BMP) Construction Area Signs per CAMUTCD standards, Caltrans Special Provisions, and as directed by the Engineer Temporary Traffic Control per CAMUTCD standards, Caltrans Special Provisions, as directed by the Engineer, and as approved by County Utility relocation or adjustment are not anticipated Mortar Pressure Grouting Auxiliary work shown on the Plans and as directed by the Engineer. All construction activities, including any temporary staging, shall occur within Napa County right-of-way unless directed otherwise by the Engineer Final cleanup and demobilization Project Closeout

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 04/18/2024 – 11:30 AM
Pre-Bid Mtg: Yes – Mandatory
Pre-Bid Mtg Date: 04/05/2024 – 1:00 PM
Engineer’s Est. Min: $450000
Engineer’s Est. Max: $450000

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:RDS 23-11R

Graham Wadsworth
James.Reese@countyofnapa.org

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 04/18/2024 – 11:30 AM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.