*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
2022/2023 AC Berm Curb Program
- Post ID: 189783
- Posted: 07/10/2023
- Updated: 07/12/2023
Project Information
*BidAmerica Membership is required to view all information.*
Agency Information
*BidAmerica Membership is required to view the agency contact information.*
Todd Gutjahr (909) 797-2489
tgutjahr@yucaipa.org
Documents Available
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
Other Projects
Modular Site Work at Liberty High School
Scope of Services Please review Calculations and Drawing Details for thorough understanding of work and submit RFls for clarifications or
Mark Thomas Drive and Sloat Avenue Separated Bike/pedestrian Path Study, Preliminary Design, and Environmental Document
SCOPE OF WORK SCOPE OF WORK FOR MARK THOMAS DRIVE AND SLOAT AVENUE SEPARATED BIKE/PEDESTRIAN PATH STUDY, PRELIMINARY DESIGN, AND
Citywide Street Sweeping Services
SCOPE OF SERVICES :The City is seeking qualified contractors with a minimum of three (3) years of experience providing Citywide
R-16.2 PIPELINE
DESCRIPTION OF WORK: The Work includes the provision of all equipment, labor, and materials necessary to complete the construction of
Vista Canyon Bridge and Road Improvements Project
Project Description: The Vista Canyon Bridge and Road Improvements project will construct a new bridge over the Santa Clara River,
Questions / Comments
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.