*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
# 04-24 Architectural Services
- Post ID: 195112
- Posted: 08/17/2023
- Updated: 09/01/2023
Project Information
*BidAmerica Membership is required to view all information.*
Agency Information
*BidAmerica Membership is required to view the agency contact information.*
Michael.esparza@sausd.us
Documents Available
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
Other Projects
ON-CALL SANITARY SEWER SPOT REPAIRS AND CCTV INSPECTION SERVICES FY 2024-2025
The project includes on-call repairs and CCTV inspection services to the City’s sanitary sewer
system on an as needed basis.
Latigo Canyon Retaining Walls Rehabilitation Project
SCOPE OF WORK In general, the proposed improvements consist of demolition of existing Midwest Guard Rail Systems (MGS) and retaining
Bixler Road and Regatta Drive Intersection Improvements
General work description: The work to be done generally consists of installing a PCC pedestrian path, curb ramps, a rectangular
MURRAY FIELD AIRPORT REHABILITATE RUNWAY 12/30, TAXIWAY A, AND TAXIWAY A1 – A4
SCOPE OF WORK: Site mobilization; initial site clean-up; site preparation; removal of asbestos-containing materials from walls and ceilings; or from
Citywide East Site Radio Communications Tower
PROJECT DESCRIPTION The City plans to construct a new communications tower and associated support equipment at 2001 Strauch Drive in
Questions / Comments
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.