*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

YUCCA Loma Road Widening

DESCRIPTION OF WORK: The Project generally consists of providing the necessary labor, equipment and materials to cold mill existing AC pavement, install AC overlay, sawcut and remove existing AC pavement, clear and prepare sub-grade, place and compact crushed aggregate base and AC pavement, construct curb and gutter, construct sidewalk, and construct curb ramps along Yucca Loma Road from Apple Valley Road to approximately 1200 feet east of Apple Valley Road, in accordance with the project plans, standard specifications, special provisions, and as directed by the Town Engineer. Contractor must ensure that two lanes of travel remain open at all times. Work on the Project shall be completed within 50 working days.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 04/18/2024 – 10:00 AM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Est. Min: $1500000
Engineer’s Est. Max: $1800000

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:2015-06

Rich Berger
rberger@applevalley.org

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 04/18/2024 – 10:00 AM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.