WWTP3 Digester Gas Booster Blower Replacement Project

Scope of Services The work to be performed consists, in general, of the removal and replacement of the existing digester gas booster blower system at Wastewater Treatment Plant No. 3 located at 6901 McCutchen Road, Bakersfield, CA 93313. The blower system will include three new skids with independent cooling chiller systems, new power, control panel, and a new pre-engineered shade structure (canopy). In addition, the work includes the removal and replacement of multiple digester gas equipment over four existing digester including the pressure and vacuum relief valves, flame arrestors, sediment traps, manhole covers, and backpressure regulators.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 05/09/2024 – 11:00 AM
Pre-Bid Mtg: Yes – Non-Mandatory
Pre-Bid Mtg Date: 04/24/2024 – 10:00 AM
Engineer’s Est. Min: $6350000
Engineer’s Est. Max: $6350000

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:E3K305

Husain Ali
hali@bakersfieldcity.us

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 05/09/2024 – 11:00 AM

Other Projects

R-16.2 PIPELINE

DESCRIPTION OF WORK: The Work includes the provision of all equipment, labor, and materials necessary to complete the construction of

Read More »

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.