*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

TANK A-B Water Transmission Pipeline Project

SCOPE OF SERVICES To prepare this report, Crawford: • Reviewed geologic, soils, and fault maps pertaining to the site; • Discussed the project needs with Mr. Simon Gray, PE, with Coleman Engineering (Coleman); • Performed three seismic refraction lines along the proposed alignment; • Drilled, logged, and sampled 10 exploratory borings along the proposed pipeline alignment to auger refusal or a maximum depth of approximately 11.5 feet (ft) below ground surface (bgs), whichever came first; • Performed laboratory testing on soil samples recovered from the borings; • Performed geotechnical analysis; and • Developed conclusions and recommendations based on the data and test results.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 02/08/2024 – 2:00 PM
Pre-Bid Mtg: Yes – Non-Mandatory
Pre-Bid Mtg Date: 12/14/2023 – 9:00 AM
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:No.11088

Charles Palmer
charlesp@ccwd.org

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 02/08/2024 – 2:00 PM

Other Projects

R-16.2 PIPELINE

DESCRIPTION OF WORK: The Work includes the provision of all equipment, labor, and materials necessary to complete the construction of

Read More »

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.