Modular Buildings Purchase PCY Phase II
SCOPE OF WORK: Any change in the scope of the Work, method of performance, nature of materials or price thereof,
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Angela Tsang 951-279-3567
angela.tsang@coronaca.gov
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
SCOPE OF WORK: Any change in the scope of the Work, method of performance, nature of materials or price thereof,
THIS PROJECT INCLUDES BC Science & Engineering Building (Phase II) Flooring project
THIS PROJECT INCLUDES RECREATION CENTER – POOL SLIDE REPAIR & REFURBISHMENT
General work description: Repair spalled surface area and building roof, & replace tunnel tile.
SCOPE OF WORK. The 2018 edition of the Standard Specifications for Public Works Construction and the 2019 Errata No. 1
DESCRIPTION OF WORK The work in general consists of roadway rehabilitation. The work will include roadway excavation, asphalt concrete overlay,
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.