On-System Roadway Rehabilitation 2024
DESCRIPTION OF WORK The work in general consists of roadway rehabilitation. The work will include roadway excavation, asphalt concrete overlay,
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Erin Smith
esmith@alamedaca.gov
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
DESCRIPTION OF WORK The work in general consists of roadway rehabilitation. The work will include roadway excavation, asphalt concrete overlay,
Construction of 2024 Storm Drain Project, Project No. 014-9744, including, but not limited to: mobilization; traffic control and construction signage;
SCOPE OF SERVICES The CMARE becomes a collaborative member of the County’s project team members. The CMARE will support the
Scope of Services Ramona Exp. Pavement Project (CIP 5099) Cold milling and asphalt concrete overlay consisting of AC base course
Scope of Services The overall project shall consist of but is not limited to providing all labor, supervision, power, equipment,
Scope of Work For and in consideration of the payments and agreements to be made and performed by AGENCY, CONTRACTOR
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.