*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

San Clemente Pump Station Outfall Pipe Rehabilitation Project

Project Description & Goals: The San Clemente Pump Station Outfall Pipe Rehabilitation Project is a capital improvement project to replace the corroded outfall pipe and related components of the largest storm water pump station in Corte Madera. Work includes repairing the pump station wall, removing the existing welded steel pipe and manifold and replacing it with HDPE pipe and components; installing new vent pipes, check valves, flexible expansion joints, air valves, discharge header, pipe supports, foundations, and fencing.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 04/03/2024 – 4:00 PM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Est. Min: $2520000
Engineer’s Est. Max: $2520000

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:22-001

Chris Good
cgood@tcmmail.org

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 04/03/2024 – 4:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.