*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Ridge Route Median Improvement Project

SCOPE OF WORK The scope of work includes but not limited to traffic control; removal and disposal of existing brick planters and associated median paving; clearing and grubbing; imported fill; excavation; construction of PCC foundation and rebar reinforced block wall; installation of waterproof cement coating and decorative cobblestone. The locations and scope of work for median improvements are as follows: RIDGE ROUTE DR. BETWEEN SUNNYBROOK CIRCLE AND ROCKFIELD BLVD. GOWDY AT RIDGE ROUTE DR.

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 02/15/2024 – 10:00 AM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:PW-24S07

Johncarlo Meza (949) 282-5223
jmeza@lakeforestca.gov

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 02/15/2024 – 10:00 AM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.