Roofing Project – Rim High School Section2
SCOPE OF WORK: The Contractor shall perform within the time stipulated the contract as herein defined, and shall provide all
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Belgin Cuhadaroglu 949-361-6128
cuhadaroglub@san-clemente.org
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
SCOPE OF WORK: The Contractor shall perform within the time stipulated the contract as herein defined, and shall provide all
THIS PROJECT INCLUDES Windmill Springs Portable addition (2)
Description. The Project is located at Shannon Road, Town of Los Gatos, and is described as follows: the project includes
SCOPE OF WORK: The Contractor shall furnish all labor, materials, equipment, tools, and utility and transportation services, and perform and
General work description: The work to be done generally consists of installing a prefabricated Debris Separating Baffle Box (DSBB) on
SCOPE OF SERVICES The scope of work includes coordination with the Park District, research, field reconnaissance, and appropriate environmental impact
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.