Cowell Road Maintenance Project
DESCRIPTION: The work to be done in general consists of mobilization; traffic control; water pollution control program; clearing, grubbing, trimming,
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
DBE.Forms@dot.ca.gov
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
DESCRIPTION: The work to be done in general consists of mobilization; traffic control; water pollution control program; clearing, grubbing, trimming,
Scope of Services The Project consists of concrete and site work
THIS PROJECT INCLUDES Annual Sewer Replacement/Maintenance FY 2023-2024
SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all
THIS PROJECT INCLUDES AVENUE R AND 27TH STREET MAINLINE REPLACEMENT
General work description: The work to be done generally consists of replacing existing guardrails including posts, railing, and end treatments
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.