OAKLAND UNIFIED SCHOOL DISTRICT ENERGY CONSERVATION PROJECT CALSHAPE PROGRAM
SCOPE OF WORK FOR ENERGY EFFICIENCY PROJECT HVAC ECM 4.1 – CalSHAPE Ventilation – Assessment and Maintenance (A&M), Filters, CO2
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Lon-Det Givens 951-565-5184
lgivens@riversidetransit.com
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
SCOPE OF WORK FOR ENERGY EFFICIENCY PROJECT HVAC ECM 4.1 – CalSHAPE Ventilation – Assessment and Maintenance (A&M), Filters, CO2
SCOPE OF SERVICES Roll Gate Preventive Maintenance and Repair There are currently approximately 20 roll gates at CDA facilities located
SCOPE OF WORK Demolition work shall consist of and include all site demolition, sawcutting, removals, salvaging, and stockpiling, including
Scope of Services The City of Pomona (the “City”) is soliciting bids from firms for “Pomona Library Facility Improvements, PROJECT
SCOPE OF WORK: Although the City is attempting to identify the limits and services required, this should not necessarily limit
Description of Work: The work in general consists of full width 9” full depth reclamation with cement, asphalt concrete paving,
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.