Installation of Drinking Fountain & Water Bottle Filling Stations
SCOPE OF WORK Install twelve (12) Elkay Drinking Fountain & Bottle Filling stations and nine Multipure Aquaform Systems Point of
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
David Nobbs (714) 532-6468
dnobbs@cityoforange.org
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
SCOPE OF WORK Install twelve (12) Elkay Drinking Fountain & Bottle Filling stations and nine Multipure Aquaform Systems Point of
Description of Project The Project is a citywide roadway pavement rehabilitation project consisting of 26 segments of on various residential,
SCOPE OF WORK Engineering Services: Civil Engineering Services: Including but not limited to site development, infrastructure design, and transportation engineering.
DESCRIPTION OF THE WORK: The work to be performed includes, but is not limited to, installation of water transmission main
Scope of Services The proposed work shall be performed in accordance with the plans, specifications and other contract documents and
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.