Installation of Drinking Fountain & Water Bottle Filling Stations
SCOPE OF WORK Install twelve (12) Elkay Drinking Fountain & Bottle Filling stations and nine Multipure Aquaform Systems Point of
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Kellen Freeman (951) 240-4234
Kellen.Freeman@TemeculaCA.gov
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
SCOPE OF WORK Install twelve (12) Elkay Drinking Fountain & Bottle Filling stations and nine Multipure Aquaform Systems Point of
DESCRIPTION: The City of Orinda is situated in the Oakland/Berkeley hills immediately east of the Caldecott Tunnel on Highway 24
Scope of Services: The selected firm will conduct a detailed assessment and analysis of the storm drain system in Grand
Scope of Services Garfield Avenue Median Improvements Project, Ferguson Drive to East Gage Avenue. The work to be done consists
General work description: Methacrylate, polyester overlay and joint seals
DESCRIPTION: Work may include, but is not limited to the following: Geotechnical report peer review Slide and erosion analysis with
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.