*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

Professional Consultant Design Services for State Route 60/redlands Boulevard Interchange Improvements

PROJECT DESCRIPTION The SR-60/Redlands Boulevard interchange was constructed in 1964. The existing interchange consists of the Redlands Boulevard overcrossing with eastbound and westbound entrance and exit ramps. Both ramp intersections are signalized. The entrance ramps are currently not metered. The Redlands Boulevard overcrossing (PM 20.37, Bridge Number 56-0487) has four spans, with precast girders that are simply supported by two-column bents and open-ended diaphragm abutments. The bents and abutments are on Cast in Drilled Hole (CIDH) piles. The bridge is approximately 236 feet long, 34 feet wide, and spans four through lanes and both entrance ramps on SR- 60

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 05/09/2024 – 5:00 PM
Pre-Bid Mtg: None
Pre-Bid Mtg Date: None
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:2024-016

SDLandscape@moval.org

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 05/09/2024 – 5:00 PM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.