Columbia/Crystal Springs Storm Drain Improvements
DESCRIPTION OF WORK EST. QTY. UNIT UNIT PRICE TOTAL COST Mobilization Temporary Traffic and Pedestrian Control Demolition Sheeting, Shoring, &
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Micah Herd 562-868-0511
micahherd@santafesprings.org
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
DESCRIPTION OF WORK EST. QTY. UNIT UNIT PRICE TOTAL COST Mobilization Temporary Traffic and Pedestrian Control Demolition Sheeting, Shoring, &
Scope of Work 3.1. Scope of Services The Scope of work for this project includes the remodel of a 5,515
SCOPE OF WORK: Brief Scope Statement: Provide a fully functional dual-arm chilled water booster pump integrated to existing controls system
Project Description: The project to be constructed consists of:
• Asphalt Concrete (AC) – HMA
• Digouts (Roadway Excavation)
•
Scope of Services ***Awarded contracts may be split between board-up services and Glass/Tint Services*** The City of Ontario is seeking
Scope of Services The City of Indio is seeking a qualified consultant to perform as-needed professional services for Landscape Architecture
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.