Pool Circulation Pump Replacement
PROJECT DESCRIPTION: The scope of work for this project consists of, but is not necessarily limited to the following: Removal
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Laura Bragg (951) 308-6367
Laura.Bragg@TemeculaCA.gov
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
PROJECT DESCRIPTION: The scope of work for this project consists of, but is not necessarily limited to the following: Removal
THIS PROJECT INCLUDES CAÑADA ROAD PAVEMENT PRESERVATION PROJECT TOTAL PROJECT APPROXIMATELY 5.50 MILES IN LENGTH WITH APPURTENANT WORK THERETO IN
DESCRIPTION : Work may include, but is not limited to the following: General structural engineering services Inspection and testing services
SCOPE OF WORK City of Vista, California Electric Vehicle Supply Equipment Infrastructure Project RELATED DOCUMENTS The Contract and any design-build
SCOPE OF WORK Huntington Beach Union High School District (District) desires to contract with one highly qualified Bidder to pick
General work description: Culvert lining
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.