Coral and Limekiln Intersection Improvements
Description of Work. The Project to be performed consists of furnishing all labor, materials, tools, equipment, and transportation required to
*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*
*BidAmerica Membership is required to view all information.*
*BidAmerica Membership is required to view the agency contact information.*
Kyle Brodowski 949-718-3464
kbrodowski@newportbeachca.gov
*BidAmerica Membership is required to view the Plans / Specs / Documents.*
Description of Work. The Project to be performed consists of furnishing all labor, materials, tools, equipment, and transportation required to
Description of Project shall include but is not limited to: Removal of the existing parking stripes, concrete wheel stops, speed
General work description: Channel excavation and partially grouted rock slope protection.
Scope of Work Detail of Scope Furnishes, install, and remove wastewater containment and ancillary pumping equipment for four (4) separate
DESCRIPTION OF WORK: A brief description of all Work performed on that day. A summary of all other pertinent events
Scope of Work Tree Trimming Services The Tree Trimming Contractor (hereinafter called the “Contractor”) will recognize and perform in accordance
If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.