*BidAmerica Membership is required to view the Agency Project Page, Project Contact Information, and Plans / Specs / Documents.*

New HVAC Installation, New Shade Structures, New Play Structure, Entrance Modification and Restroom Alteration Project

SCOPE OF WORK: The Contractor shall furnish all labor, materials, equipment, tools, and utility and transportation services, and perform and complete all work required in connection with SAN CAYETANO ELEMENTARY SCHOOL, NEW HVAC INSTALLATION, NEW SHADE STRUCTURES, NEW PLAY STRUCTURE, ENTRANCE MODIFICATION & RESTROOM ALTERATION PROJECT. PROJECT NO. #2024-005 / DSA #03-122485(Shade Canopies), DSA #03-122477 (Play Structure) ARTICLE 1 - & DSA #03-123232 (HVAC)Piru Elementary School New HVAC Installation, New Shade Structures, HC Parking Modifications, Restroom Alterations & New Modular Restroom Building Installation (“Project”)

Project Information

*BidAmerica Membership is required to view all information.*

Bid Date: 05/15/2024 – 10:00 AM
Pre-Bid Mtg: Yes – Mandatory
Pre-Bid Mtg Date: 05/01/2024 – 3:00 PM
Engineer’s Estimate: Not Available
 

Agency Information

*BidAmerica Membership is required to view the agency contact information.*

Agency Project #:2024-005

Lynn Cole
lcole@fillmoreusd.org

Documents Available

*BidAmerica Membership is required to view the Plans / Specs / Documents.*

Bid Date: 05/15/2024 – 10:00 AM

Other Projects

Questions / Comments

If you have any questions, use the green Live Chat button on the lower right side of the screen. Please be sure to include either the Post Id or the Project Name as reference.